Mfm Contracting Corp. is a company located at 335 Center Avenue, Mamaroneck. It was registered as a domestic business corporation in Westchester county, under id number 2529030 on 07/07/2000, 24 years ago.
This firm is, according to the official data, being managed by Michael V Petrillo from Mamaroneck.
The data below is presented in a way identical to how it exists in government databases. Several companies can exist nationwide under the same name. Please be advised to check whether the information provided pertains to the specific company you are looking for.
This company successfully applied for a Department of Consumer Affairs license as a home improvement contractor and can be found at 335, Center Ave, Mamaroneck. You can reach them by calling (914)777-8292.
Moving on to the City of New York contracts awarded to the company, we can list:
"replacement of sanitary and water main and appurtenances in park terrace west etc.-borough of manhattan".
The contract was categorized as "construction/construction services" and awarded using the competitive sealed bids method by the Design and Construction agency.
It began on 05/12/2017, valued at $13,224,953.13.
Then there is "reconstruction of worth street from hudson street to park row-borough of manhattan", chosen using the competitive sealed bids and started on 12/28/2015. It was worth $80,013,850.88.
"Trunk water mains in west 30th street between 10th avenue and 9th avenue, etc. to connect to shaft 26b to the distribution system - borough of manhattan", the final of the three was worth $37,683,676.33. It was chosen using the competitive sealed bids and began on 04/24/2015.
Per the NYC database, Mfm Contracting Corp won 8 contracts from this New York City agency.
Mfm Contracting Corp. was also contracted by the Correction. They did 1 contract, such as:
"vernon c. bain center (vcbc) barge and bulkhead rehabilitation" (worth: $1,375,859.38).
Mfm Contracting Corp. was awarded 1 contract by the Parks and Recreation agency (Contract Administration division).
Title | Amount | Date |
---|---|---|
Agency: Design and Construction | ||
Replacement Of Sanitary And Water Main And Appurtenances In Park Terrace West Etc.-borough Of Manhattan | $13,224,953.13 | 05/12/2017 |
Reconstruction Of Worth Street From Hudson Street To Park Row-borough Of Manhattan | $80,013,850.88 | 12/28/2015 |
Trunk Water Mains In West 30th Street Between 10th Avenue And 9th Avenue, Etc. To Connect To Shaft 26b To The Distribution System - Borough Of Manhattan | $37,683,676.33 | 04/24/2015 |
Cobblestone Reconstruction Of Peck Slip From Pearl Street To South Street- Borough Of Manhattan. | $20,400,629.37 | 04/07/2011 |
East 34th Street Select Bus Service From Fdr Drive To Lexington Avenue- Borough Of Manhattan. | $23,562,877.20 | 11/06/2013 |
Reconstruction Of Boller Avenue From Station 10 Plus 50 Station 18 Plus 00, Needham Avenue From Station 11 Plus 09 To Station 14 Plus 75- Borough Of The Bronx. | $7,899,480.42 | 08/12/2013 |
Green Infrastructure In Hutchinson River Area - Phase I - The Bronx | $3,194,745.50 | 06/09/2014 |
Installation Of Perimeter Security Measures-group A Sites | $11,059,443.51 | 10/29/2018 |
Agency: Correction | ||
Vernon C. Bain Center (vcbc) Barge And Bulkhead Rehabilitation | $1,375,859.38 | 01/03/2017 |
Agency: Parks and Recreation | ||
Furnishing Cover Material In The Golf Course In Ferry Point Park | $7,993,500.00 | 04/25/2012 |
LOCATION UNAVALIABLE
Petro Builders Inc.
Domestic Business Corporation
Zamy LLC
Domestic Limited Liability Company
Werkheiser Home Maintenance, Inc.
Domestic Business Corporation
Blondie's Treehouse, Incorporated
Domestic Business Corporation
T.j. Wilson Electric Inc.
Domestic Business Corporation